|
|
|
|
Most Popular Systems Design and Development Reports |
 |
 |
 |
sponsored by Dell, Inc. and Intel
|
|
|
|
|
 |
 |
TEST RESULTS: Posted: 24 Sep 2009 | Published: 01 May 2009
In this report, we estimate both the number of older solutions each Dell PowerEdge R710 solution can replace and the payback period for replacing those older solutions. One key finding discovered is that each Dell PowerEdge R710 solution can replace up to nine Dell PowerEdge 2850 solutions, and could yield a payback in around 9 months.
Get This Now
|
by Dell, Inc. and Intel 
|
|
 |
VIDEO: Posted: 14 Jul 2009 | Premiered: 14 Jul 2009
High availability (HA) for hypervisors is vital to limit unplanned downtime, making it critical to discern which technology works best for your virtual environment. This videocast compares popular hypervisor methods used to ensure high availability.
Get This Now
|
by Dell and Microsoft 
|
|
 |
WHITE PAPER: Posted: 14 May 2009 | Published: 01 Apr 2009
Trade study analysis is an effective method of comparing potential solutions to a given problem. Using a model-driven approach allows you to perform trade studies before development or implementation begins and saves time, money, and development headaches. Read on to learn more.
Get This Now
|
by IBM 
|
|
 |
WHITE PAPER: Posted: 04 Feb 2009 | Published: 03 Feb 2009
The planning sequence described in this paper covers the design of the data center's physical infrastructure layer, whose job it is to house, power, cool, and protect the data center's computing and network functions.
Get This Now
|
by APC 
|
|
 |
WHITE PAPER: Posted: 22 Jun 2007 | Published: 01 Jun 2007
A floor plan strongly affects the power density capability and electrical efficiency of a data center. This paper provides structured floor plan guidelines for defining room layouts and for establishing IT equipment layouts within existing rooms.
Get This Now
|
by APC 
|
|
|  |
|